Isuzu Trooper>> Transmission and running gear>> Running gear>> Internal CV JOINT

6.3.2. Internal CV JOINT

Dismantling

PERFORMANCE ORDER
1. Disconnect the battery from weight. Clear the hinge of dirt and lubricant.
2. Remove collars from a cover of the internal hinge. Pull together a cover from the hinge.
3. Remove an internal spring ring. Get a half shaft from the internal hinge.
4. Remove a lock ring of a holder of balls, get a holder. Remove a ball holder and the case of the hinge from shlits.
5. Remove covers and a quencher of fluctuations (if it is provided). The external hinge non-demountable is also replaced entirely.
6. Clear of dirt and lubricant.

Assembly

PERFORMANCE ORDER
1. Bend the external hinge at an angle 40 ° and turn a half shaft, be convinced of smoothness of rotation of both sections of a half shaft.
2. Wrap up vents a tape.
3. Dress a cover on external section of a half shaft and fix by spring rings.
4. Put fresh lubricant in the hinge and a cover, replace cover collars.
5. Dress a cover of the internal hinge, establish a quencher of fluctuations (if it is provided).
6. Establish a holder of balls, the case of the hinge and a lock ring.
7. Put fresh lubricant in the hinge and a cover, install the hinge.
8. Establish a spring ring in a flute.
9. Dress a cover, level and tighten new collars, having entered the tool under a cover.
10. Establish a half shaft.